KUNDUZ CITY (Pajhwok): Cracks have appeared in the Sher Khan dry port bridge as a result of a recent earthquake, prompting traders and customs officials to ask the government for urgent repairs.
The 670-metre long and 11-metre wide bridge on Amu River, linking Afghanistan with Tajikistan, was constructedat a cost of more than $30 million, provided by the United States.
A pillar of the bridge cracked due to the 7.7 magnitude earthquake that killed and injured more than . . .









