NEILI (Pajhwok): The residents of central Daikundi province have begun constructing a standard bridge over the Helmand river in Pai Skan area on self-help basis.
The residents said the only substandard wooden bridge connects 20,000 people in the region, and it get destroyed several times a year and people themselves have to rebuild it. Since last 20 days, the bridge has broken and vehicular traffic has been stopped.
Now the people have decided to rebuild the bridge fundamentally.
Chaman Ali Eftekhari, resident of Mir Ghulam district, told Pajhwok the bridge connected Mir Ghulan area with Skan and then . . .









